9视频在线精品,亚洲婷婷精品视频,亚洲日韩九九在线一区,一区二去三去免费观看,日韩中文人妻熟女二区,青青操成人视频网,久久久久久少妇无码,无码人妻一区二区三区,国产久久精品66

Welcome to the official website of Lihong Safety Equipment Engineering (Shanghai) Co., Ltd.!
Position首頁 > Home > Evaluation and retrofit > Evaluation/Acceptance > Factory Equipment Assessment
Factory equipment evaluation


1729585630625519.png

· Risk analysis of the whole plant equipment

·All risk assessment methods

·Performance level PLr required by safety control system

·Safety control system performance level PL

·Declaration of conformity report


395181ccb7a771e30162f6415dc922a.pngBasic construction

Step 1: Machine Definition:

·Is to determine the scope of the system to be analyzed, such as the stages of the life cycle of the machine, the parts and/or functions of the machine.

Step 2: Hazard Identification

·The goal of hazard identification is to form a list of hazards, hazardous states and/or hazardous events, which can describe when and how the hazardous states may cause injuries.

· Hazard identification is the most important step in any risk assessment. Only after the hazards are identified can actions be taken to reduce the risks associated with them. Unrecognized hazards may lead to injuries.

Step 3: Risk estimation
·
After confirming the dangerous state and phenomenon of machinery, determine the risk elements, and predict the danger through "the possibility of hazard occurrence" and "its probability"。

Step 4: Risk assessment
·After estimating the risk, evaluate the risk and determine whether it is necessary to reduce the risk.

Step 5: Risk reduction
·When it is necessary to reduce risks, take safety measures such as design changes and safety protection measures shown in step 5.
·Repeat the process from step 1 to step 5, and finally reduce the risk to an appropriate level.


395181ccb7a771e30162f6415dc922a.pngRisk Assessment Risk Reduction Description


·Risk reduction or reduction is to reduce the risk to an acceptable level by taking protective measures.
·Risk reduction is the ISO12100:2010 standard, which integrates ISO 12100-1: 2003, ISO 12100-2: 2003, ISO14121, ISO15706, ISO13849 and ISO16855. This standard mainly provides designers with what they need when designing and manufacturing safety machinery.


395181ccb7a771e30162f6415dc922a.pngUse function of intelligent software risk assessment module/linkage module


Evaluation of some equipment in the factory

Industry evaluation

Job evaluation

Hidden danger assessment

1646363845660968.jpg

3.jpg

4.jpg

隱患評估.png

·  How many high-risk devices are not evaluated?

·  How many devices are not evaluated for low risk?

· How many units of risk have not been assessed 3.

· How many devices have not been evaluated?

·  Normal behavior

·  Frequent violations

·  To be observed

· Safety assessment of PHA process

·  JSA operation safety assessment

· Major hidden danger assessment

· Serious hidden danger

· Common hidden danger

·  Minor hidden danger

      Use the evaluation software function to standardize the evaluation management of factory equipment, sort out the risk level of all equipment in the factory, and evaluate the loop level of PL safety control system at the same time. If you need to try the software, please contact customer service staff.

Related Products
Download
PDF file download
Video file download
Previous

Contact us

400-881-6062

Lihong Safety Equipment Engineering (Shanghai) Co., Ltd.

E-Mail: info@lh-safety.com

Address: 581 Xiuchuan Road, Chuansha Town, Pudong New District, Shanghai

(Greenland East Coast International Plaza-Room A 313)

Copyright ? Lihong Safety Equipment Engineering (Shanghai) Co., Ltd.  ICP19034341-1  Technical Support: lanjujing

Online service

Online message

  • Click to refresh
  • 湟中县| 津市市| 西城区| 桃江县| 仪征市| 日照市| SHOW| 邵阳县| 齐河县| 台山市| 南京市| 龙山县| 若羌县| 莱芜市| 揭东县| 台江县| 鱼台县| 同心县| 竹山县| 抚远县| 思南县| 桐庐县| 洛扎县| 通许县| 尉犁县| 汽车| 内江市| 吉木乃县| 连城县| 额济纳旗| 绩溪县| 青川县| 五莲县| 镇平县| 于田县| 文成县| 张家港市| 丰顺县| 新田县| 安阳县| 蒲江县|